50 YEARS OF ACHIEVEMENTS

explore image

Training centre

Starting Date: 2016 Deadlines: 21 Month

The Group has adopted the training approach as an essential success factor, through the mobilization of the flagship training centre.dscjs dcshdcsjhdc sdhcshdjh kjku iiu oppko pop jjjjjjjjjjjjc jhjb iuhiush

 Sidi-Bel-Abbès
explore image

ANTI-CANCER CENTRE

Starting Date: 2017 Deadlines: 20 Month

The sba anti-cancer centre, which complies with international standards and is equipped with advanced technologies, will relieve pressure on local health infrastructure for a population of two million.

 Sidi-Bel-Abbès
explore image

TABIA HOSPITAL

Starting Date: 2016 Deadlines: 21 Month

Tabia Hospital: a structure made with modern technical standards this structure should fill the gap that the region suffers from in care and medical management.oeifzeoijfàzef àeçzf çeàfe e

 Sidi-Bel-Abbès
explore image
ANES RESIDENCE

Starting Date: 01/08/2017 Deadlines: 12 Month

Realization of 112 promotional housing in R + 15 with 2 levels commerce and 02 levels of parking in the basement.

 Oran
explore image
Concrete works

Starting Date: 01/01/2006 Deadlines: 11 Month

Solid waste landfill; geomembrane, geotextile and geodrain sealing kezfoziefozifo ozids ssdd ds sd dsd sd ds sd ezoie ozeie

 Bouira
explore image
RYAD RESIDENCE

Starting Date: 01/03/2015 Deadlines: 21 Month

The elRyad complex in Bir el djir–Oran comprises 1540 collective dwellings, 232 individuals, green spaces, infrastructure and land.

 Oran
explore image
TEACHING PLACES

Starting Date: 05/09/2018 Deadlines: 24 Month

Construction of 3000 “electrical and computer engineering” teaching places at the university campus.

 Sidi-Bel-Abbès
explore image
University campus

Starting Date: 13/09/2007 Deadlines: 23 Month

Construction of a university city consisting of 6000 beds with their accompanying structures. ytfyt tftrd

 Sidi-Bel-Abbès
explore image
EL MAKAM MOSQUE

Starting Date: 08/01/2016 Deadlines: 8 Month

Realization of a mosque for the city Makam el Chahid.jfie efiefjzek zekzjezkj kjez kj eife fe ff f f f e f uygu utfyt tfyt trdtef

 Sidi-Bel-Abbès
explore image
Concrete works

Starting Date: 01/01/2010 Deadlines: 11 Month

Concreting works for flood protection canals lot no. 04, 05 & 06. Development works for the mekkera wadi.

 Sidi Bel Abbes
explore image
EL MEDINA RESIDENCE

Starting Date: / Deadlines: 30 Month

The project is a real estate complex consisting of 06 residential buildings and a shopping centre located on a rectangular plot of 10,000 m².

 Sidi-Bel-Abbès
explore image
EL FATH RESIDENCE

Starting Date: / Deadlines: 24 Month

The residential center is integrated in the city center of sidi bel abbés, it consists of 92 high standing housing distributed in three towers of 6, 8 and 10 floors.

 Sidi-Bel-Abbès
explore image
STRUGAL PLANT

Starting Date: 05/01/2014 Deadlines: 12 Month

Construction work of an industrial building in steel frame.

 Sidi-Bel-Abbès
explore image
MDM PLANT

Starting Date: 02/01/2015 Deadlines: 20 Month

Construction work of an industrial building in steel frame.

 Sidi-Bel-Abbès
explore image
ENIE

Starting Date: 29/05/2016 Deadlines: 21 Month

Renovation of a hangar, including offices, technical facilities

 Sidi-Bel-Abbès
explore image
HOTEL TAHAT

Starting Date: 01/01/2018 Deadlines: 24 Month

Rehabilitation of Hotel Tahat, with 108 rooms in Tamanrasset iz d ajodi"zo ia oiaz izoiza izao

 Tamanrasset
explore image
Renovation of the town hall of Sidi-Bel-Abbès

Starting Date: 01/09/2018 Deadlines: 5 Month

Rehabilitation of the headquarters (roof of the castle) of the APC of Sidi-Bel-Abbés.

 Sidi-Bel-Abbès

Ask question

Contact

Block K10, city Makam Chahid Sidi-Bel-Abbès, Algeria

info@groupe-hasnaoui.com

+213 (0)48 770 317

Copyright © 2023 Groupe des Sociétés HASNAOUI. All Rights Reserved-Designed by GSH